Solar Atta Chakki— Free Power, Zero Bills
Run your flour mill entirely on solar energy. No electricity bill. No load-shedding downtime. Serve more customers and save ₹8,000–₹22,000 every month — starting in the very first month of installation.
Solar Power Replacing Grid for Your Chakki Motor
A Solar Atta Chakki system replaces the electricity connection of your flour mill motor with solar power. Instead of paying ₹8–₹12 per unit for grid electricity (or even more for diesel), your mill runs on completely free solar energy for 8–10 hours every day.
The system uses a Variable Frequency Drive (VFD) between the solar panels and the motor, which smoothly regulates motor speed based on available solar power — protecting the motor from voltage fluctuations and extending its life.
An optional battery backup keeps your chakki running during brief cloudy spells or in the early morning and late evening. You can also have a hybrid setup that draws from the grid when solar is insufficient.

Solar Atta Chakki Packages
Fully installed price including panels, VFD, structure, wiring and commissioning.
5 HP
4 kW System · Single Stone Mill- Monthly Saving:
- ₹8,000
- Payback:
- 15 months
- Grinding Capacity:
- 200–250 kg/day
7.5 HP
6 kW System · Double Stone Mill- Monthly Saving:
- ₹12,000
- Payback:
- 14 months
- Grinding Capacity:
- 350–400 kg/day
10 HP
8 kW System · Heavy Duty Mill- Monthly Saving:
- ₹16,000
- Payback:
- 13 months
- Grinding Capacity:
- 500–600 kg/day
15 HP
12 kW System · Industrial Mill- Monthly Saving:
- ₹22,000
- Payback:
- 13 months
- Grinding Capacity:
- 700–900 kg/day
Life-Changing Benefits for Chakki Operators
Zero Electricity Cost From Day 1
The moment your solar system is commissioned, your electricity meter stops spinning. Your chakki motor runs on completely free solar power every sunny day.
No More Load-Shedding Downtime
Power cuts that previously cost you ₹500–₹2,000/day in lost business are eliminated. With optional battery backup, you keep grinding even on cloudy days.
Increase Daily Grinding Capacity
Without worrying about electricity bills, you can run your mill for longer hours — grinding more per day and serving more customers.
Protect Your Motor from Voltage Issues
The VFD (Variable Frequency Drive) controller provides stable power to your motor, eliminating damage from grid voltage fluctuations — extending motor life by 2–3 years.
Diesel Generator Replacement
If you currently run a diesel genset for your chakki, solar replaces it completely — saving ₹15,000–₹40,000/month in diesel costs with zero noise or fumes.

* Based on ₹12/unit rate and 8 hrs/day operation. Actual savings vary by location and tariff.
From Survey to Grinding in 4 Steps
We study your mill’s load, design the system and install it with minimum downtime.
Free Mill Visit
We note your motor rating, running hours, current bill and available roof or ground space.
System Design
We size panels and inverter for your motor’s starting current and share a clear quote with ROI.
Installation & Testing
MNRE-certified engineers install and test with your actual mill running, keeping downtime short.
Handover & Support
You get training, warranty papers and optional AMC for regular cleaning and checks.
What’s Included in the Package
Solar PV Panels
Monocrystalline panels with a 25-year performance warranty from Tier-1 brands (Adani, Waaree, REC).
VFD / Motor Controller
Variable Frequency Drive regulates motor speed to available solar power and protects the motor from voltage swings.
Mounting Structure
Hot-dip galvanized structure for roof or ground mount, tilt optimised and wind-rated to 150 km/h.
Protection Gear
DC/AC breakers, fuses, surge protection, earthing and lightning arrestor for the whole system.
Cables & Connectors
UV-resistant DC cables and IP68 MC4 connectors, properly routed and labelled.
Monitoring App
Track daily generation, running hours and savings from your phone.
Common Questions
Will my mill run at night?
A direct solar system powers the mill in daylight. At night or in heavy cloud the mill can run from the grid as usual, so grinding is never blocked.
What solar size do I need for my motor?
As a guide: 5 HP needs about 4 kW, 10 HP about 7.5 kW and 15 HP about 11 kW. We confirm after checking your actual load.
How fast will I recover the cost?
Based on our estimates most mills recover the cost in around 14–15 months, depending on running hours and your tariff.
Is any subsidy available?
Some schemes support solar for small businesses and agriculture-linked units. We check what applies to you during the survey.
Ready to Start With Solar Atta Chakki?
Get a free site survey and custom proposal — no obligations.


